CLOSED-LOOP WELL SETBACKS

Session: 103rd General Assembly
Year: 2024
Bill #: HB4792
Category: Environment
Position: Oppose
Mandate?
Revenue Loss?
Authority Preemption?

View bill

Summary as Introduced

Amends the Illinois Water Well Construction Code. Provides that the minimum lateral setback distance between a closed-loop well and a storm sewer, sanitary sewer, combined sewer, or any other potential source of contamination is 5 feet. Specifies that setbacks from footing drains and pits, crawl spaces, and basements do not apply to closed-loop wells.



Back to Bill List